e-1 |
sub-station works |
e-1-1 |
hv cable installation and support for hv cable (inside pit) |
e-1-2 |
hv panel installation |
e-1-3 |
hv cable pit detail |
e-1-4 |
connection hv cable for transformer |
e-1-5 |
connection lv cable for transformer |
|
|
e-2 |
cable ladder |
e-2-1 |
excavation & backfilling work & duct bank detail |
e-2-2 |
cable ladder detail |
e-2-3 |
l & t shape ladder detail |
e-2-4 |
ladder strainght joint & clamp |
e-2-5 |
cable ladder grounding |
e-2-6 |
cable ladder support under purlin |
e-2-7 |
cable laddder support under concrete ceiling |
e-2-8 |
cable ladder support at bend point |
e-2-9 |
detail cable rack down from cr to top of panel |
e-2-10 |
penetration for inside wall |
e-2-11 |
penetration for floor |
|
|
e-3 |
trunking |
e-3-1 |
trunking & cover detail |
e-3-2 |
trunking connector |
e-3-3 |
trunking cross connection, grounding |
e-3-4 |
trunking hanger support |
|
|
e-4 |
cable & wiring |
e-4-1 |
wiring color code |
e-4-2 |
wire connection and taping |
e-4-3 |
terminal wire connection |
|
|
e-5 |
piping work |
e-5-1 |
detail fix piping & box in concrete slab |
e-5-2 |
detail fix piping & box in concrete column |
e-5-3 |
install conceal piping& box in brick wall |
e-5-4 |
install expose piping & box |
e-5-5 |
install expose piping on the purlin |
|
|
e-6 |
low voltage panel |
e-6-1 |
expose panel installation |
e-6-2 |
panel detail |
e-6-3 |
bolt size for terminal block |
|
|
e-7 |
power supply for mechanical equipments |
e-7-1 |
power supply for air conditioner |
e-7-2 |
cable, wiring & piping for ventilation |
|
|
e-8 |
lighting, emergency, exit lighting system |
e-8-1 |
v shape light support and installation |
e-8-2 |
recessed light support and installation |
e-8-3 |
reflector light support and installation |
e-8-4 |
highbay light support and installation |
e-8-5 |
exit light installation |
e-8-6 |
emergency light installation |
e-9 |
socket, tel, lan system |
e-9-1 |
socket & switch installation |
e-9-2 |
socket installation for wall fan |
e-9-3 |
socket installation for shutter door |
e-9-4 |
wiring device arrangement at corner and near door |
e-9-5 |
wiring device arrangement in kitchen and toilet |
|
|
e-10 |
fire alarm system |
e-10-1 |
main alarm panel system |
e-10-2 |
install heat (smocke) detector on purlin, on concrete ceiling and ceiling |
e-10-3 |
combination panel (hose box) installation & piping |
|
|
e-11 |
public address system |
e-11-1 |
horn speaker detail of fixing |
e-11-2 |
ceiling specker detail of fixing |
e-11-3 |
attenator installation |
|
|
e-12 |
earthing system |
e-12-1 |
detail of grounding rod |
e-12-2 |
earthing detail |
|
|
e-13 |
lightning protection installation |
e-13-1 |
lightning protection pole installation |
e-13-2 |
lightning protection cable installation |
e-13-3 |
lightning protection test box installation |
|
|
e-14 |
external system |
e-14-1 |
exterior lighting pole detail |
e-14-2 |
low voltage manhole detail |
e-14-3 |
high voltage manhole detail |
e-14-4 |
excavation and backfilling work |
e-14-5 |
duct bank & cable route mark detail |
e-14-6 |
cable route mark plan |
|
|
e-15 |
other |
e-15-1 |
painting detail |
e-15-2 |
name detail |